PMAR Archaeological Monitoring Plan

An archaeologist accompanies the execution of your works to prevent, control and mitigate impacts on evidence that appears by chance in the soil or subsoil.

  • P01DGPA
  • Ministry processing time: 10 business days (TUPA)
  • During the works

What it is

What it is

It is the authorization, granted by Directoral Resolution, for the archaeological monitoring by an archaeology professional during the execution of infrastructure and service works of a public or private investment project.

Read more

It is preventive: it seeks to avoid, control, reduce and mitigate possible negative impacts on archaeological, historical or paleontological evidence that is found by chance in the soil or subsoil.

Related reading: How to obtain authorization to carry out an Archaeological Monitoring Plan (PMAR) in Peru (in Spanish)

Archaeologist in protective gear examining a stone wall

At a glance

When

When your project needs it

  • During works involving soil removal.
  • When the works may uncover evidence by chance in the soil or subsoil.
  • In works with or without pre-existing infrastructure, in an underwater environment, or in an immovable asset from the post-pre-Hispanic period (each case has additional requirements).

How we work

How we work, step by step

Choose a step to see what we do in it.

Step 1 / 5

Project review

We review the project and the areas with soil removal.

What you obtain

How it works, animated

An archaeologist accompanies the execution of your works to prevent, control and mitigate impacts on evidence that appears by chance in the soil or subsoil.

Requirements

What the Ministry of Culture requires

Summary of the TUPA requirements for this procedure. We help you prepare each one.

Application and sworn statements
  • Application form with the applicant's details (if it is a company, signed by the legal representative, with RUC and registry entry).
  • Sworn statement from the project director, with their professional registration number and practice license number, and their commitment not to affect cultural heritage.
  • Sworn statement from the project holder, with the commitment to financing and not to affect cultural heritage.
  • Receipt number and payment date.
Technical information signed by the director
  • General project information: name, modality, type of work, level of intervention, location and scope.
  • Technical description of the Archaeological Monitoring Plan (PMAR): objectives, archaeological and historical background, works to be carried out, field and office methodology, extent to be monitored, staff and schedule.
  • Proposed mitigation and prevention measures.
Plans
  • Perimeter and planned works plans in .dwg format, georeferenced in UTM, Datum WGS 84, signed by the competent professional, in printed and digital versions.
Cases with additional requirements
  • With pre-existing infrastructure: panoramic and detail photographs and satellite images of the infrastructure.
  • In an underwater environment: anomaly report with geophysical studies and a diagnosis of the existence or absence of cultural heritage.
  • In an immovable asset from the post-pre-Hispanic period: the license or resolution that authorizes the work, according to the legal framework of the project.

Plain-language summary of the TUPA requirements of the Ministry of Culture, R.M. N.° 000124-2025-MC (Ministerial Resolution), consulted on 24 October 2026. No fees are included. Check the current version on gob.pe before you apply.

What we deliver

What Laguitos Perú delivers

  • Management of the authorization up to the Ministry of Culture's Directoral Resolution, and the plan with the prevention, control and mitigation measures.
  • The field follow-up during the works.
  • The monitoring report and its results.

FAQ

Frequently asked questions

How long does the Ministry take to authorize a PMAR?

Ministry processing time: 10 business days (TUPA). It is a Ministry deadline, not Laguitos Perú's, and it may vary: check the current version on gob.pe.

How long does the authorization last?

Its validity is set in the authorization resolution. It can be extended for the same period, and the extension can be renewed for up to the same period granted.

What happens if evidence appears during monitoring that the works cannot avoid?

In that case an Archaeological Rescue Project (PRA) applies. The TUPA provides for additional requirements for a PRA arising from a PMAR, such as a preliminary diagnosis of the evidence.

Contact

Does your project need an archaeological study?

Tell us the stage and the location. We will propose the study route and the team to carry it out.