Skip to content

What the territory keeps Archaeological studies before Peru's Ministry of Culture and high-Andean ecosystem restoration.

Archaeologists recording an excavation laid out with grids and strings

Line 01 · Cultural heritage

What the ground holds

Archaeology and paleontology services for mining, construction and infrastructure projects.

  • DAS
  • CIRAS
  • PEA
  • PMAR
  • PRA
View archaeological services
High-Andean bofedal at dawn, with pools among the vegetation

Line 02 · High-Andean ecosystems

What holds the water

Diagnosis, restoration, compensation and monitoring of high-Andean ecosystems: puna, wetlands and bofedales (high-Andean peatlands).

  • Rescue
  • Transplant
  • Monitoring
  • GIS
View environmental services
Certified integrated system
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • ISO 37001
  • ISO/IEC 27001
Approved by Bureau Veritas & SGS
View certifications

Services

Twelve services, two lines of work

Each service with its full name, the moment your project needs it and what you receive at the end. Open each one to see the process, requirements and legal basis.

Archaeologists recording an excavation laid out with grids and strings

Line 01 · Cultural heritage

What the ground holds

Archaeology and paleontology services for mining, construction and infrastructure projects. Studies, certifications and plans for Peru's Ministry of Culture, so that projects can advance with legal certainty.

  • DAS
  • CIRAS
  • PEA
  • PMAR
  • PRA
  1. Archaeological Surface Diagnosis

    Determines the archaeological potential of an area before operations begin.

    DAS Specialized Digital Platform
    When
    When assessing a site or before design.
    What you receive
    A technical report with the diagnostic results, signed by a registered and licensed archaeologist.
  2. Certificate of Non-Existence of Archaeological Remains on the Surface

    Official document confirming that the area shows no visible archaeological remains on the surface.

    P02DGPA · 20 business days (TUPA)
    When
    Before carrying out works or activities on the property.
    What you receive
    The CIRAS file and support throughout the procedure until the Ministry of Culture issues the certificate.
  3. Archaeological Evaluation Project

    Survey and limited excavation to determine the presence of pre-Hispanic, mixed or isolated archaeological assets.

    P06DGPA · 30 business days (TUPA)
    When
    When there are signs of remains or the subsoil must be assessed.
    What you receive
    A report on the presence of pre-Hispanic archaeological assets and isolated elements in the area evaluated.
  4. Archaeological Monitoring Plan

    Measures to prevent, control and mitigate impacts on pre-Hispanic, historical or paleontological remains.

    P01DGPA · 10 business days (TUPA)
    When
    During works involving soil removal.
    What you receive
    Management of the authorization up to the Ministry of Culture's Directoral Resolution, and the plan with the prevention, control and mitigation measures.
  5. Archaeological Rescue Project

    Excavation to recover and record archaeological material wherever an activity will take place.

    P07DGPA · 30 business days (TUPA)
    When
    When works will affect an area with archaeological evidence.
    What you receive
    The recovery and recording of the archaeological material from the area.
  6. Archaeological baseline survey

    Archaeological reconnaissance for baseline: field prospection and historical analysis that identify the cultural heritage of the project area.

    When
    In environmental studies, to avoid work stoppages due to unforeseen finds.
    What you receive
    An archaeological baseline survey report for the project area.
Archaeological clearance instrumentsDAS, CIRAS, PEA, PMAR and PRA: see, animated, what is done in the field and what you obtain, a certificate or a resolution.
High-Andean bofedal in the mist, with pools among the vegetation

Line 02 · High-Andean ecosystems

What holds the water

Diagnosis, restoration, compensation and monitoring of high-Andean ecosystems: puna, wetlands and bofedales (high-Andean peatlands). Environmental engineering, biodiversity and GIS applied to high-Andean peatlands and wetlands.

  • Rescue
  • Transplant
  • Monitoring
  • GIS
  1. Environmental diagnosis and biological baseline

    Field surveys, botanical validation, aerial photography and GIS to delineate peatlands and priority species.

    When
    Before intervening in a high-Andean ecosystem.
    What you receive
    The delimitation of bofedales and priority species.
  2. Ecosystem restoration

    Rescue and transplanting of plant species, site conditioning and management measures to support their recovery.

    When
    In disturbed or degraded areas.
    What you receive
    Rescue and transplanting of plant species.
  3. Environmental offsetting

    Transfer of vegetation-soil-root units from the impact area to the recipient area, with origin-to-destination traceability.

    When
    When the project affects a peatland and must compensate for it.
    What you receive
    A compensation plan with the impact area, the receiving area and the selected units.
  4. Environmental and biodiversity monitoring

    Vegetation, hydrology, soil and fauna: every data point with date, location, person in charge and method.

    When
    After works, to measure results.
    What you receive
    Indicators of vegetation, hydrology, soil and fauna.
  5. GIS and environmental mapping

    1:1000 maps from drone orthophotos, UTM vertices, geodatabase and delivery in GeoJSON.

    When
    At every stage: delineate, plan and audit.
    What you receive
    Maps of delimitation of impact areas and compensation areas.
  6. Field environmental supervision

    Control of work fronts in fragile ecosystems, with IPERC, job safety analysis (ATS) and PPE.

    When
    During works.
    What you receive
    Control of work fronts with IPERC and ATS.

Other services

  • Rental of 4×4 pickup trucks equipped for mining
  • Restoration of archaeological monuments
  • Restoration and conservation of cultural property
  • Delineation of archaeological sites and signage
  • Analysis of archaeological material
  • Archaeological advisory and anthropological studies

Your project roadmap

Answer three questions and see which studies apply

An indicative guide to reach the first meeting with a clear picture. Send it via WhatsApp and we will reply about your case.

1Project type
2At what stage is your project?
3Are there peatlands or wetlands in the area?

Suggested route

Indicative route. The exact scope depends on current regulations and site conditions, and we will confirm it with you before quoting.

Projects

Projects that move earth or affect high-Andean ecosystems

We support public and private project holders from the land assessment to monitoring. These are the most common project types and the studies they usually involve.

  • Mining

    Frequent studiesArchaeological baseline, CIRAS or DAS, PEA and PMAR; environmental diagnosis, offsetting and monitoring.

  • Roads

    Frequent studiesDAS or CIRAS before design; PMAR during the works; PRA if an archaeological asset cannot be avoided.

  • Energy and transmission lines

    Frequent studiesDAS or CIRAS for the route; PMAR during installation.

  • Drinking water and sanitation

    Frequent studiesDAS or CIRAS for the area; PMAR in trenches and networks.

  • Buildings and land titling

    Frequent studiesDAS or CIRAS for the property; PMAR if soil is removed.

Alliances

Alliances that back our work

Private companies and public institutions with which Laguitos Perú has alliances in Peru.

Private sector

  • Nexa
  • Sillustani S.A.
  • Hochschild Mining
  • Minera Suyanarca
  • Los Quenuales
  • Newmont
  • Aruntani S.A.C.
  • Raura
  • Minsur
  • Fiansa
  • Pan American Silver
  • Volcan Compañía Minera
  • Barrick
  • Cámara de Comercio Canadá-Perú
  • Geotecnia Andina
  • Amphos 21
  • Cerro de Pasco Resources
  • E29 Element
  • FyA Contratistas
  • Hannan Metals

Public sector

  • Municipalidad Distrital de Vilcabamba
  • Municipalidad Distrital de Pucará
  • Municipalidad Distrital de San Sebastián
  • Municipalidad Provincial de Lampa
  • PRONIED
  • Provías Nacional

Compliance & assurance

ISO certifications & supplier homologation

Certified integrated management system and supplier homologation for mining, energy and infrastructure.

  • ISO ISO
    9001:2015

    Quality Management

    Quality control from planning to final delivery.

  • ISO ISO
    14001:2015

    Environmental Management

    Sustainable operations and field environmental control.

  • ISO ISO
    45001:2018

    Occupational Health & Safety

    Risk prevention and HSEC protocols on site.

  • ISO ISO
    37001:2016

    Anti-Bribery Management

    Transparency, ethics and anti-corruption compliance.

  • ISO/IEC ISO/IEC
    27001:2022

    Information Security

    Protection of GIS maps, dossiers and project data.

Supplier homologation

Audited by leading certifying bodies

Audited quality, HSEC and compliance for mining and infrastructure.

  • Quality & processes
  • HSEC management
  • Legal compliance
  • Confidentiality & performance
Bureau Veritas Supplier homologation
SGS Supplier homologation

Need ISO certificates, homologations or our dossier for procurement?

Request dossier & certificates

The territory

Where we work: the high Andes of Peru

Lagoons, bofedales (high-Andean peatlands), puna grasslands and ravines: the landscapes where archaeology and ecology meet.

  • Birds at the lagoon
    Birds at the lagoon
  • Vicuñas on the puna
    Vicuñas on the puna
  • High-Andean flowers
    High-Andean flowers
  • Stream between cushion plants
    Stream between cushion plants
  • High-Andean valley
    High-Andean valley
  • Frog in the wetland
    Frog in the wetland
  • Channels seen from the air
    Channels seen from the air
  • Mist over the bofedal
    Mist over the bofedal
  • Sunset on the puna
    Sunset on the puna
  • High-Andean vegetation mosaic
    High-Andean vegetation mosaic

How Laguitos Perú works

From diagnosis to follow-up, without losing a single data point

Science, execution and data control within one team. Every claim can be traced to a document, a date or a piece of evidence.

Before intervening, we survey and map the terrain: we define what is protected and where work is carried out.

In heritage work, the DAS and the archaeological baseline identify the area's potential. In ecosystems, the ecological diagnosis delineates bofedales and priority species.

With the diagnosis, we define which procedure applies before the Ministry of Culture, in what order and with which risks.

In ecosystems, planning relies on GIS: routes, access points, channels and work fronts.

Execution advances in phases, and each work front is reviewed in the field with its IPERC and ATS before starting.

If remains appear, they are recovered through an Archaeological Rescue Project. In bofedales, units are extracted and transported with origin-to-destination traceability.

Every data point is recorded with date, location, person in charge and method. Each vegetation unit keeps its batch, coordinates, time and condition until its destination.

During soil removal, the PMAR monitors the remains. If monitoring shows deviations, actions are taken and the design is adjusted.

We deliver the documents for each stage. Every claim is backed by a document, a date or evidence.

In ecosystems, we deliver maps, geodatabase and data in GeoJSON, together with the field supervision reports.

Documented feedback loop: alerts → actions → verification → design update.

Our values

  • Confidentiality
  • Perseverance
  • Diligence
  • Excellence
  • Reliability
  • Safety
High-Andean valley with wetlands and snow-capped mountains

What lives on the land and what lies beneath it, with one team.

Archaeology, heritage and high-Andean ecosystems in a single study route.

Contact

Does your project involve earthmoving or affect a high-Andean ecosystem?

Tell us the stage and the location. We will propose the study route and the team to carry it out.